Online Planning Services

Planning Application Details

  • Current applications will include an option to make a comment underneath the application details below.
  • To ensure that comments can be included in the officer's report for an application, they should be received by the council within 21 days of the Received as Valid Date (see below). All comments received before a decision is made will be taken into account, whether they are represented in the officer's report or not.
  • A signed copy of the Decision Notice, produced on Haringey Council letter headed paper can be obtained from the Development Management Support Team




Application details

Reference number
Application Type
Site Location


View location on map (opens in new window)
Proposed Development
Ward
 
Received as Valid Date
Consultation End Date
Application Status
Decision Date
Decision Level
Temp. Permission Expiry Date
Case officer
James Farrar  
Applicant Name
Agent name
Applicant Address
Agent Address

This application is open for consultation.

Attachments

Access Parameters (Emerging Context).pdf -
Access Parameters (Existing Context).pdf -
Application Form.pdf -
Arboricultural_Impact_Assessment_and_Method_Statement.pdf -
Building 2 - East and North Elevations.pdf -
Building 2 - Level 00 Plan.pdf -
Building 2 - Level 03 Plan.pdf -
Building 2 - Roof Plan.pdf -
Building 2 - Section AA.pdf -
Building 2 - South and West Elevations.pdf -
Building 2A - Level 00 Plan.pdf -
Building 2A - Level 05 Plan.pdf -
Building 2A - Level 06 Plan.pdf -
Building 2A - North and East Elevations.pdf -
Building 2A - Roof Plan.pdf -
Building 2A - Section A-A.pdf -
Building 2A - South and West Elevation.pdf -
Building 2A - Typical Level Plan 01-02 (2).pdf -
Building 2A - Typical Level Plan 01-02.pdf -
Building 2A - Typical Level Plan 03-04.pdf -
Building 3 - East Elevation.pdf -
Building 3 - Level 00 Plan.pdf -
Building 3 - Level 01 Plan.pdf -
Building 3 - Level 02-07 Plan.pdf -
Building 3 - Level 08 Plan.pdf -
Building 3 - Level 09-14 Plan (2).pdf -
Building 3 - Level 09-14 Plan.pdf -
Building 3 - Level 15 Plan.pdf -
Building 3 - North Elevation.pdf -
Building 3 - Roof Plan.pdf -
Building 3 - Section A-A.pdf -
Building 3 - South Elevation.pdf -
Building 3 - West Elevation.pdf -
Building Footprint Parameters (Existing Context).pdf -
Building footprints - Maximum Parameters (Emerging context).pdf -
Building Heights - Maximum Parameters (Emerging Context).pdf -
Building Heights - Maximum Parameters (Existing Context).pdf -
CFAH_ES_-_Appendix_A1_-_Development_Site_Boundary_Plan.PDF -
CFAH_ES_-_Appendix_A2_-_Policy_Matrix.PDF -
CFAH_ES_-_Appendix_B1_-_Scoping_Request_to_LBH_(part_1).PDF -
CFAH_ES_-_Appendix_B1_-_Scoping_Request_to_LBH_(part_2).PDF -
CFAH_ES_-_Appendix_B1_-_Scoping_Request_to_LBH_(part_3).PDF -
CFAH_ES_-_Appendix_B2_-_LBH_Scoping_Opinion.PDF -
CFAH_ES_-_Appendix_B3_-_Scoping_Update_Letter_to_LBH.PDF -
CFAH_ES_-_Appendix_C1_-_Scheme_Plans.PDF -
CFAH_ES_-_Appendix_C2_-_Demolition_and_Construction_Statement.PDF -
CFAH_ES_-_Appendix_C3_-_Construction_Logistics_Plan.PDF -
CFAH_ES_-_Appendix_D1_-_TVIA_Policy_Context.PDF -
CFAH_ES_-_Appendix_D2_-_TVIA_Assessment_Methodology_&_Significance_Criteria.PDF -
CFAH_ES_-_Appendix_D3_-_Townscape_Areas_and_Representative_Views.PDF -
CFAH_ES_-_Appendix_D4_-_TVIA_Visualisations_and_Assessment.PDF -
CFAH_ES_-_Appendix_E1_-_Transport_Assessment_(Part_1).PDF -
CFAH_ES_-_Appendix_E1_-_Transport_Assessment_(Part_2).PDF -
CFAH_ES_-_Appendix_E1_-_Transport_Assessment_(Part_3).PDF -
CFAH_ES_-_Appendix_E1_-_Transport_Assessment_(Part_4).PDF -
CFAH_ES_-_Appendix_E1_-_Transport_Assessment_(Part_5).PDF -
CFAH_ES_-_Appendix_E2_-_Transport_Survey_Data.PDF -
CFAH_ES_-_Appendix_E3_-_Cumulative_Schemes_for_Transport_Assessment.PDF -
CFAH_ES_-_Appendix_F1_-_Internal_DS_Analysis.PDF -
CFAH_ES_-_Appendix_F2_-_Assessment_Model.PDF -
CFAH_ES_-_Appendix_F3_-_Reference_Plans_for_Neighbouring_Windows_Properties_Assessed.PDF -
CFAH_ES_-_Appendix_F4_-_Open_Spaces_Assessed.PDF -
CFAH_ES_-_Appendix_F5_-_Daylight_and_Sunlight_Results.PDF -
CFAH_ES_-_Appendix_F6_-_Two_Hour_Sunlight_Contour_Plots_and_Results.PDF -
CFAH_ES_-_Appendix_G1_-_Social_and_Community_Infrastructure_Audit.PDF -
CFAH_ES_-_Appendix_G2_-_Residential_Population_Calculations.PDF -
CFAH_ES_-_Appendix_G3_-_Active_Places_Power_Sports_Facilities_Calculation.PDF -
CFAH_ES_-_Appendix_G4_-_Private_Amenity_Space_Calculations.PDF -
CFAH_ES_-_Appendix_G5_-_Child_Occupancy_and_Play_Space_Requirements.PDF -
CFAH_ES_-_Appendix_H1_-_Heritage_Assets_Map.PDF -
CFAH_ES_-_Appendix_H2_-_Above_Ground_Heritage_Assessment_(part_1).PDF -
CFAH_ES_-_Appendix_H2_-_Above_Ground_Heritage_Assessment_(part_2).PDF -
CFAH_ES_-_Appendix_I1_-_Contour_Wind_Plots_-_Pedestrian_Safety_Assessment.PDF -
CFAH_ES_-_Appendix_I2_-_Contour_Plots_for_Individual_Wind_Directions.PDF -
CFAH_ES_-_Appendix_I3_-_Site_Terrain_Adjustment.PDF -
CFAH_ES_-_Appendix_I4_-_CFD_Technical_Assumptions.PDF -
CFAH_ES_-_Appendix_J1_-_Relevant_UK_Air_Quality_Strategy_Objectives.PDF -
CFAH_ES_-_Appendix_J2_-_IAQM_Construction_Assessment_Methodology.PDF -
CFAH_ES_-_Appendix_J3_-_Traffic_Data_(used_for_Air_Quality_Analysis).PDF -
CFAH_ES_-_Appendix_J4_-_Air_Quality_Model_Verification.PDF -
CFAH_ES_-_Appendix_J5_-_Wind_Rose_for_Heathrow_Airport_(2015).PDF -
CFAH_ES_-_Appendix_J6_-_Air_Quality_Model_Results.PDF -
CFAH_ES_-_Appendix_K1_-_Guidance_for_Noise_and_Vibration_Assessments.PDF -
CFAH_ES_-_Appendix_K2_-_Site_Suitability_(Noise_and_Vibration).PDF -
CFAH_ES_-_Appendix_K3_-_Noise_Survey_Information.PDF -
CFAH_ES_-_Appendix_L1_-_Envirocheck_(part_1).PDF -
CFAH_ES_-_Appendix_L1_-_Envirocheck_(part_2).PDF -
CFAH_ES_-_Appendix_L1_-_Envirocheck_(part_3).PDF -
CFAH_ES_-_Appendix_L1_-_Envirocheck_(part_4).PDF -
CFAH_ES_-_Appendix_L1_-_Envirocheck_(part_5).PDF -
CFAH_ES_-_Appendix_L1_-_Envirocheck_(part_6).PDF -
CFAH_ES_-_Appendix_L1_-_Envirocheck_(part_7).PDF -
CFAH_ES_-_Appendix_L1_-_Envirocheck_(part_8).PDF -
CFAH_ES_-_Appendix_L1_-_Envirocheck_(part_9).PDF -
CFAH_ES_-_Appendix_L2_-_RSK_Cannon_Factory_(part_1).PDF -
CFAH_ES_-_Appendix_L2_-_RSK_Cannon_Factory_(part_2).PDF -
CFAH_ES_-_Appendix_L2_-_RSK_Cannon_Factory_(part_3).PDF -
CFAH_ES_-_Appendix_L2_-_RSK_Cannon_Factory_(part_4).PDF -
CFAH_ES_-_Appendix_L3_-_RSK_Ashley_House_(part_1).PDF -
CFAH_ES_-_Appendix_L3_-_RSK_Ashley_House_(part_2).PDF -
CFAH_ES_-_Appendix_L4_-_Regulator_Responses.PDF -
CFAH_ES_-_Appendix_M1_-_Water_Environment_and_Flood_Risk_Legislation,_Policy_and_Guidance.PDF -
CFAH_ES_-_Appendix_M2_-_Flood_Risk_Assessment_&_Outline_Drainage_Strategy_(December_2016)_(part_1).PDF -
CFAH_ES_-_Appendix_M2_-_Flood_Risk_Assessment_&_Outline_Drainage_Strategy_(December_2016)_(part_2).PDF -
CFAH_ES_-_Appendix_M2_-_Flood_Risk_Assessment_&_Outline_Drainage_Strategy_(December_2016)_(part_3).PDF -
CFAH_ES_-_Appendix_M2_-_Flood_Risk_Assessment_&_Outline_Drainage_Strategy_(December_2016)_(part_4).PDF -
CFAH_ES_-_Appendix_M2_-_Flood_Risk_Assessment_&_Outline_Drainage_Strategy_(December_2016)_(part_5).PDF -
CFAH_ES_-_Appendix_M2_-_Flood_Risk_Assessment_&_Outline_Drainage_Strategy_(December_2016)_(part_6).PDF -
CFAH_ES_-_Appendix_M2_-_Flood_Risk_Assessment_&_Outline_Drainage_Strategy_(December_2016)_(part_7).PDF -
CFAH_ES_-_Appendix_M2_-_Flood_Risk_Assessment_&_Outline_Drainage_Strategy_(December_2016)_(part_8).PDF -
CFAH_ES_-_Appendix_M2_-_Flood_Risk_Assessment_&_Outline_Drainage_Strategy_(December_2016)_(part_9).PDF -
CFAH_ES_-_Appendix_M2_-_Flood_Risk_Assessment_&_Outline_Drainage_Strategy_(December_2016)_(part_10).PDF -
CFAH_ES_-_Appendix_N1_-_Extended_Phase_1_Habitat_Survey_and_Building_Inspection_(Bats)_(part_1).PDF -
CFAH_ES_-_Appendix_N1_-_Extended_Phase_1_Habitat_Survey_and_Building_Inspection_(Bats)_(part_2).PDF -
CFAH_ES_-_Appendix_O1_-_Cumulative_Schemes_Map.PDF -
CFAH_ES_-_Appendix_O2_-_Annual_mean_NO2_at_Ground_Level.PDF -
CFAH_ES_-_Appendix_O3_-_Annual_mean_NO2_at_Second_Floor.PDF -
CFAH_ES_-_Appendix_O4_-_Cumulative_VSC_Results.PDF -
CFAH_ES_-_Appendix_O5_-_Cumulative_Shadow_Results.PDF -
CFAH_ES_-_Chapter_A_-_Introduction_and_Background.PDF -
CFAH_ES_-_Chapter_B_-_Scope_and_Methodology.PDF -
CFAH_ES_-_Chapter_C_-_Site_and_Scheme_Description.PDF -
CFAH_ES_-_Chapter_D_-_TVIA.PDF -
CFAH_ES_-_Chapter_E_-_Transport.PDF -
CFAH_ES_-_Chapter_F_-_Daylight,_Sunlight_and_Overshadowing.PDF -
CFAH_ES_-_Chapter_G_-_Socio-Economic_Effects.PDF -
CFAH_ES_-_Chapter_H_-_Built_Heritage.PDF -
CFAH_ES_-_Chapter_I_-_Environmental_Wind.PDF -
CFAH_ES_-_Chapter_J_-_Air_Quality.PDF -
CFAH_ES_-_Chapter_K_-_Noise_and_Vibration.PDF -
CFAH_ES_-_Chapter_L_-_Ground_Conditions_and_Contamination.PDF -
CFAH_ES_-_Chapter_M_-_Water_Environment_and_Flood_Risk.PDF -
CFAH_ES_-_Chapter_N_-_Ecology_and_Nature_Conservation.PDF -
CFAH_ES_-_Chapter_O_-_Cumulative_Effects.PDF -
CFAH_ES_-_Volume_1_-_Non-Technical_Summary.PDF -
CFAH_ES_-_Volume_2_-_Contents_Page.PDF -
CFAH_ES_-_Volume_3_-_Contents_Page.PDF -
Construction_Logistics_Plan.pdf -
Delivery_and_Servicing_Plan.pdf -
Demolition plan.pdf -
Design and Access Statement Part_1.pdf -
Design and Access Statement Part_2.pdf -
Design and Access Statement Part_3.pdf -
Design and Access Statement Part_4.pdf -
Design and Access Statement Part_5.pdf -
Design and Access Statement Part_6.pdf -
Design and Access Statement Part_7.pdf -
Design and Access Statement Part_8.pdf -
Design and Access Statement Part_9.pdf -
Design and Access Statement Part_10.pdf -
Design and Access Statement Part_11.pdf -
Design_Guidelines_-_Part_1.pdf -
Design_Guidelines_-_Part_2.pdf -
Design_Guidelines_-_Part_3.pdf -
Design_Guidelines_-_Part_4.pdf -
Development_Specification.pdf -
Drawing issue sheet 1.pdf -
Drawing issue sheet 2.pdf -
Existing Ground Levels.pdf -
Framework_Travel_Plan.pdf -
Health_Impact_Assessment.pdf -
Land Use Parameters First Floor (Emerging Context).pdf -
Land Use Parameters First Floor (Existing Context).pdf -
Land Use Parameters Ground Floor (Emerging Context).pdf -
Land Use Parameters Ground Floor (Existing Context).pdf -
Land Use Parameters Typical Floor (Emerging Context).pdf -
Land Use Parameters Typical Floor (Existing Context).pdf -
Landscape Parameters Ground Level 1.pdf -
Landscape Parameters Ground Level 2.pdf -
Landscape Parameters UpperRoof Level 1.pdf -
Landscape Parameters UpperRoof Level 2.pdf -
Masterplan Roof Plan Emerging Context.pdf -
Masterplan_-_Part_1.pdf -
Masterplan_-_Part_2.pdf -
Masterplan_-_Part_3.pdf -
PERS_Audit.pdf -
Planning application boundary.pdf -
Planning_Statement.pdf -
Proposed Levels Ground Floor (Emerging Context).pdf -
Proposed Levels Ground Floor (Existing Context).pdf -
Site Location (Proposed Buildings Shown).pdf -
Site Location.pdf -
Statement_of_Community_Involvement_-_Part_1.pdf -
Statement_of_Community_Involvement_-_Part_2.pdf -
Statement_of_Community_Involvement_-_Part_3.pdf -
Sustainable_Design_Energy_and_Construction_Statement.pdf -
validation consultation list.pdf -
Consultation comment 001.pdf - Comments from Andrew Meek
GLA acknowledgement email.pdf -
Comments from LFEPA.pdf -
Consultation comment 002.pdf - Objection from 2 Park View Rd
Comments from Greater London Archaeological Advisory Service.pdf -
Comments from Network Rail appendix.pdf -
Comments from Network Rail.pdf -
Comments from London Underground.pdf -
Comments from Environment Agency.pdf -
Initial comments from Transport for London.pdf -
Comments from Thames Water.pdf -
Comments from Designing Out Crime Officers of the Metropolitan Police.pdf -
Comments from North London Waste Authority.pdf -
GLA Stage 1 response.pdf -
Emails from Haringey Senior Drainage Engineer.pdf -
Comments from Lead Officer Pollution.pdf -
Comments from Tree and Nature Conservation Manager.pdf -
Comments from Waste Management.pdf -
Comments from Transportation.pdf -
170316 RWDI Project 1701833 Peer Review - Cannon Factory and Ashley Hous .pdf -
London N17-Ashley Road South Cannon Factory - (Commercial Strategy Repor .pdf -
449-101-P02.pdf -
449-102-P02.pdf -
449-103-P02.pdf -
449-104-P02.pdf -
1824 Plannig App 02_170419.pdf -
1824-JMP-02-00-DR-A-0002.pdf -
1824-JMP-02-00-DR-A-0007.pdf -
1824-JMP-02-00-DR-A-0013.pdf -
1824-JMP-02-00-DR-A-0016.pdf -
1824-JMP-02-00-DR-A-0017.pdf -
1824-JMP-02-00-DR-A-0018.pdf -
1824-JMP-02-00-DR-A-0019.pdf -
1824-JMP-02-01-DR-A-0008.pdf -
1824-JMP-02-01-DR-A-0014.pdf -
1824-JMP-02-02-DR-A-0009.pdf -
1824-JMP-02-02-DR-A-0015.pdf -
1824-JMP-02-XX-DR-A-0001.pdf -
1824-JMP-02-XX-DR-A-0003.pdf -
1824-JMP-02-XX-DR-A-0004.pdf -
1824-JMP-02-XX-DR-A-0005.pdf -
1824-JMP-02-XX-DR-A-0006.pdf -
1824-JMP-02-XX-DR-A-0010.pdf -
1824-JMP-02-XX-DR-A-0011.pdf -
1824-JMP-02-XX-DR-A-0012.pdf -
1824-JMP-02-XX-DR-A-1001.pdf -
1824-JMP-02-XX-DR-A-1002.pdf -
Arboricultural Report.pdf -
Cover letter.pdf -
DAS Compressed_Part1.pdf -
DAS Compressed_Part2.pdf -
DAS Compressed_Part3.pdf -
DAS Compressed_Part4.pdf -
DAS Compressed_Part5.pdf -
DAS Compressed_Part6.pdf -
DAS Compressed_Part7.pdf -
DAS Compressed_Part8.pdf -
DAS Compressed_Part9.pdf -
DAS Compressed_Part10.pdf -
Development Specification Document.pdf -
Energy Report.pdf -
Introduction to the Masterplan.pdf -
Introduction to the Masterplan_Part1.pdf -
Introduction to the Masterplan_Part2.pdf -
Introduction to the Masterplan_Part3.pdf -
Introduction to the Masterplan_Part4.pdf -
Introduction to the Masterplan_Part5.pdf -
Introduction to the Masterplan_Part6.pdf -
Introduction to the Masterplan_Part7.pdf -
Introduction to the Masterplan_Part8.pdf -
Introduction to the Masterplan_Part9.pdf -
Introduction to the Masterplan_Part10.pdf -
Planning Statement.pdf -
Revised Illustrative Scheme Drawing - Building 2A.pdf -
Revised Illustrative Scheme Drawings - Building 3.pdf -
Technical Assessment, Figures and Addendices.pdf -
Technical Assessment, Figures and Addendices_Part1.pdf -
Technical Assessment, Figures and Addendices_Part2.pdf -
Technical Assessment, Figures and Addendices_Part3.pdf -
Technical Assessment, Figures and Addendices_Part4.pdf -
Technical Assessment, Figures and Addendices_Part5.pdf -
Technical Assessment, Figures and Addendices_Part6.pdf -
Technical Assessment, Figures and Addendices_Part7.pdf -
Updated Non Technical Summary.pdf -
Comments from Thames Water 2.pdf -
NHH-Design Guidelines_Section 4-6.pdf -
NHH-Design Guidelines_Section_3.pdf -
NHH-Design Guidelines_Section_1-2.pdf -
15433-02 - McNaugher - EIA Scoping Update - 210417.PDF -
Comments from Transport for London.pdf -
Comments from Network Rail 2.pdf -
Comments from Environment Agency 2.pdf - .
Comments from Greater London Archaeological Advisory Service 2.pdf -
Comments from London Underground Infrastructure Protection.pdf -
Comments from Designing Out Crime Office 26.05.17.pdf - Further comments
Comments from Natural England.pdf -
Appendix 4 Plans and Images relation to committee report.pdf - Plans and images in relation to committee report.
Committee Report for 18 July meeting_Part1.pdf -
Committee Report for 18 July meeting_Part2.pdf -
Committee Report for 18 July meeting_Part3.pdf -
Committee Report for 18 July meeting_Part4.pdf -
Committee Report for 18 July meeting_Part5.pdf -
Committee Report for 18 July meeting_Part6.pdf -
Consultation comment 003.pdf - Objection from 3 Suffolk road

Print this page