Online Planning Services

Planning Application Details

  • Current applications will include an option to make a comment underneath the application details below.
  • To ensure that comments can be included in the officer's report for an application, they should be received by the council within 21 days of the Received as Valid Date (see below). All comments received before a decision is made will be taken into account, whether they are represented in the officer's report or not.
  • A signed copy of the Decision Notice, produced on Haringey Council letter headed paper can be obtained from the Development Management Support Team




Application details

Reference number
Application Type
Site Location


View location on map (opens in new window)
Proposed Development
Ward
 
Received as Valid Date
Consultation End Date
Application Status
Decision Date
Decision Level
Temp. Permission Expiry Date
Case officer
Wendy Robinson  
Applicant Name
Agent name
Applicant Address
Agent Address

This application is open for consultation.

Attachments

210_Plevna Drainage Report, Part 1 (compressed).pdf -
210_PLN_001-Site Location Plan.pdf -
210_PLN_010-Exisiting Site Plan(1).pdf -
210_PLN_030-Existing Section A.pdf -
210_PLN_031-Existing Section B.pdf -
210_PLN_100-Proposed Block Plan.pdf -
210_PLN_101-Proposed Site Plan.pdf -
210_PLN_200-Proposed Ground Floor Plan.pdf -
210_PLN_201-1st Floor Plan.pdf -
210_PLN_202-2nd Floor Plan.pdf -
210_PLN_203-3rd Floor Plan.pdf -
210_PLN_204-4th Floor Plan.pdf -
210_PLN_205-5th Floor Plan.pdf -
210_PLN_206-Roof Floor Plan.pdf -
210_PLN_210-Basement Floor Plan.pdf -
210_PLN_220-Proposed GF Plan - A & B.pdf -
210_PLN_221-Proposed 1F Plan - A & B.pdf -
210_PLN_222-Proposed 2F Plan - A & B.pdf -
210_PLN_223-Proposed 3F Plan - A & B.pdf -
210_PLN_224-Proposed 4F Plan - A & B.pdf -
210_PLN_225-Proposed 5F Plan - A & B.pdf -
210_PLN_226-Proposed Roof Plan - A & B.pdf -
210_PLN_230-Proposed GF Plan - C & D.pdf -
210_PLN_231-Proposed 1F Plan - C & D.pdf -
210_PLN_232-Proposed 2F Plan - C & D.pdf -
210_PLN_233-Proposed 3F Plan - C & D.pdf -
210_PLN_234-Proposed 4F Plan - C & D.pdf -
210_PLN_235-Proposed 5F Plan - C & D.pdf -
210_PLN_236-Proposed Roof Plan - C & D.pdf -
210_PLN_240-Proposed Basement Plan - C & D.pdf -
210_PLN_300_A-Proposed Elevations.pdf -
210_PLN_301_B-Proposed Elevations Reduced.pdf -
210_PLN_302_C-Proposed Elevations.compressed.pdf -
210_PLN_303_D-Proposed Elevations.pdf -
210_PLN_305-North Elevation Reduced.pdf -
210_PLN_306-South Elevation Reduced.pdf -
210_PLN_310-Proposed Bay Elevation.pdf -
210_PLN_311-Proposed Bay Section.pdf -
210_PLN_350-Proposed Section AA.pdf -
210_PLN_351-Proposed Section BB.pdf -
210_REF_800_Design and Access Statement_Part1.pdf -
210_REF_800_Design and Access Statement_Part2.pdf -
210_REF_800_Design and Access Statement_Part3.pdf -
210_REF_800_Design and Access Statement_Part4.pdf -
210_SCH_900_170620_Capacity Schedule .pdf -
783RPC Z90 960 P3 Energy Strategy.compressed.pdf -
783RPC Z90 970 Preliminary Thermal Comfort Report Rev A.pdf -
2013 survey.pdf -
23986rp08052017 NIA1 Rev1.pdf -
23986rp28032017 VAR1 Rev1.pdf -
ApplicationFormNoPersonalData.pdf -
CONSULTATION STATEMENT - Plevna Crescent - Detailed Planning Application - June 2017.pdf -
Cover Letter(1).pdf -
Daylight & Sunlight report 23rd May 2017 (FULL).pdf -
OS 1155-16 Doc 2 Plevnas Crescent Spec for soft Landscape works .pdf -
OS 1155-16 Doc 4 Rvs B Plevna PEA.pdf -
OS 1155-16 Doc 5 RvsA Plevna Crescent Play Strategy.pdf -
OS 1155-16 Doc1 Plevna Cre TR AIA AMS TPM.pdf -
OS 1155-16 Doc6 Rvs B LEE Part A.pdf -
OS 1155-16 Doc6 Rvs B LEE Part B.pdf -
OS 1155-16 Doc6 Rvs B LEE Part C.pdf -
OS 1155-16 Doc6 Rvs B LEE Part D.pdf -
OS 1155-16.1 Plevna Crescent TRRP.pdf -
OS 1155-16.2 Plevna Crescent TPP.pdf -
OS 1155-16.3 Rvs A Plevna Crescent MP.pdf -
OS 1155-16.4 Rvs A Plevna Crescent SLP.compressed.pdf -
OS 1155-16.5 Plevna Crescent HLP- North.pdf -
OS 1155-16.6 Plevna Crescent HLP- South.pdf -
P1464 Land at Plevna Crescent CMP June 2017 v2.pdf -
P1464 Land at Plevna Crescent DSMP June v2.pdf -
P1464 Land at Plevna Crescent Transport Statement June 2017 V3 Part 1.pdf -
P1464 Land at Plevna Crescent Transport Statement June 2017 V3 Part 2.pdf -
P1464 Land at Plevna Crescent Transport Statement June 2017 V3 Part 3.pdf -
P1464 Land at Plevna Crescent Transport Statement June 2017 V3 Part 4.pdf -
P1464 Land at Plevna Crescent Transport Statement June 2017 V3 Part 5.pdf -
P1464 Land at Plevna Crescent Transport Statement June 2017 V3 Part 6.pdf -
Pages from 210_Plevna Drainage Report, Part 2 (compressed).pdf -
Pages from 210_Plevna Drainage Report, Part 3 (compressed).pdf -
planning statement.pdf -
RT-MME-125416 Rev A (PRA Bat Activity Surveys).pdf -
validation consultation list.pdf -
M41992 Plevna SuDS Proforma - Rev B 2017.07.10.pdf -
M41992-C100 B FRA Report Part 1.pdf -
M41992-C100 B FRA Report Part 2.pdf -
M41992-C100 B FRA Report Part 3.pdf -
M41992-C100 B FRA Report Part 4.pdf -
Comments from Thames Water.pdf -
Consultation comments 001.pdf - Objection from 121 Plevna Crescent
Comments from Network Rail.pdf -
vegetation-management-explained.pdf - Comments from Network Rail - addendum 1
NewDevelopmentAdjacenttoNRLandAssets - Anglia.pdf - Comments from Network Rail - addendum 2
Recommended planting species.pdf - Comments from Network Rail - addendum 3
Consultation comments 002.pdf - Support from 17 Wargrave Avenue
Comments from Natural England.pdf -
Response from Friends of the Earth Tottenham & Wood Green Group.pdf -
Comments from Rail for London (RfL).pdf -
Consultation comments 003.pdf - Support from 101 Olinda Road
Consultation comments 004.pdf - Objection from 125 Plevna Crescent
Comments from Transport For London.pdf - TFL Comments
Consultation comments 005.pdf - Support from 82 Craven Park Road
Comments in response to TFL comments.pdf -
Further comments from Transport for London.pdf -
Comments from Building Control.pdf -
Transportation comments.pdf -
Consultation comments 006.pdf - Support from 39 Vicarage Road
Carbon Management comments.pdf -
Comments from Waste Management.pdf -
Comments from Lead Officer - Pollution.pdf -
Consultation comments 007.pdf - Objection from 3 Suffolk road
Comments from Housing Enabling Officer.pdf -
Comments from Environment agency.pdf -
Comments from Ecology.pdf -
Comments from Designing out Crime Officer.pdf -
Agent culvert comments 1.pdf -
Agent culvert comments 2.pdf -
Comments from LFEPA.pdf - Comments from London Fire & Emergency Planning Authority
Comments from Drainage.pdf -

Print this page